Apr. 21 at 4:38 AM
The Phase-2 Becancour Battery Material Plant will be located in the same industrial park as Ultium Cam, Eco-Pro, Nemaska Lithium, and Vale.
$NMG acquired an additional 143,000 m2 brownfield site there in February 2026 that includes a 22,000 m2 industrial building. The site has direct access to highways, railway, and port infrastructure on the St. Lawrence River.